A collection of thoughts about planning, building and enjoying a backyard trail network in central Vermont.

Friday, October 10, 2014

More Nordic Trail Work

We're slowly making headway on the new nordic trail that will connect the loop trail around the front of our house to the top of the rope tow behind the house.  The cutting of the trail has been a little overwhelming but we're making progress!

Here is the trail at the 3rd (and last) switchback.


At the top of the ridge.  I used the pole saw to cut those high branches that were hanging into the trail.


From the same spot (as the picture above) but looking in the orher direction towards the top of the rope tow.


The final steep climb after the last switchback.






No comments: